Singapore, 9 APRIL 2026 — Levanta Renewables — Southeast Asia’s leading renewable energy platform backed by Actis — today announced the award and signing of an Engineering, Procurement and Construction (EPC) contract with China Energy Engineering Group (CEEC) for the Barotac Solar Power and Battery Energy Storage System (BESS) project in the Visayas, Philippines.


The contract covers the full EPC scope for a 166 MWp solar photovoltaic (PV) facility integrated with an 80 MWh BESS, designed to enhance grid stability and support reliable power supply in the region.

This award marks an important step in advancing our greenfield portfolio in the Philippines, reflecting Levanta’s end-to-end capabilities across development, financing, construction, and operations. By combining Levanta’s development expertise with CEEC’s EPC capabilities, we are well positioned to deliver the project to high standards of execution, reliability, and safety.

Pramod Singh, CEO of Levanta Renewables

Leave a Reply

Your email address will not be published. Required fields are marked *

This field is required.

This field is required.